The Joint Waste DPD was adopted by the four East London Waste Authority Boroughs in early 2012. This page details the earlier stages of the DPD's preparation.

Adoption


Following the conclusion of the examination and receipt of the Inspector's report, the final Joint Waste DPD was taken to Council meetings for adoption in early 2012 on the following dates: 19 January 2012 (Redbridge); 1 February 2012 (Havering); 22 February 2012 (Barking and Dagenham); and 27 February 2012 (Newham). The adopted Joint Waste DPD (and accompanying documents) can be found on the main Joint Waste DPD page.


Examination


Following its submission, the Joint Waste DPD was examined by a Government appointed Inspector, with public hearings taking place between 5 April 2011 and 7 April 2011. The Inspector's binding report was received by the East London Waste Authority boroughs on 14 November 2011. Details of the examination can be found on the Joint Waste DPD examination page.


Submission


The Joint Waste DPD was submitted to the Secretary of State on 30 November 2010, for examination. The documents submitted at this stage are set out below:


Schedule of Advertised Proposed Changes


Consultation on the Schedule of Advertised Proposed Changes to the Joint Waste DPD took place between 27 September 2010 and 8 November 2010. This consultation regarded changes proposed to the Joint Waste DPD presented in the Proposed Submission Draft consultation last year. The Schedule of Advertised Proposed Changes documents can be viewed below.


Proposed Submission


Public consultation on the Joint Waste DPD Proposed Submission took place between 17 August 2009 and 28 September 2009. The Proposed Submission document took forward the Preferred Options, including refined policies and site allocations. Comments were required to focus on matters of soundness and legal compliance as part of the DPD's preparation for submission for independent examination.


Preferred Options


Public consultation on the Joint Waste DPD Preferred Options took place between 7 April 2008 and 19 May 2008. The Preferred Options included options for policies and site allocations.


Issues and Options


Public consultation on the Joint Waste DPD Issues and Options took place between 16 April 2007 and 4 June 2007. The Issues and Options established the spatial issues and options for preparing the DPD.

Scoping report



Consultation of the Joint Waste DPD Sustainability Appraisal Scoping Report took place between 9 October 2006 and 13 November 2006. The publication of the scoping report represent's the first stage of the DPD's preparation. It sets out the parameters within which the Sustainability Appraisal of the Joint Waste DPD would be carried out.